Giant King Grass To Fuel Bioenergy Plants in California

An 18-MW biomass plant is set to reopen in Imperial, California as part of the ML Energy Park after a 2010 earthquake damaged the facility. Viaspace signed a contract with Mesquite Lake Water and Power LLC to supply the plant with its Giant King Grass (GKG) feedstock, which will be mixed with wood waste.

via Renewable Energy News – RenewableEnergyWorld.com http://ift.tt/1jDHSEs

Leave a Reply

Or

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>